| 1. | Study on initial path planning layout model for uav 无人机初始路径规划空间建模方法研究 |
| 2. | Preparing detailed planning layouts and engineering designs 制订详细的规划图则及工程设计方案; |
| 3. | Town planning layout 城市规划详细蓝图 |
| 4. | Part v at last the paper take the example of changsha new - high technology industrial development zone , and analyze its overall plan layout 5 、最后以长沙高新技术产业开发区为例,对其总平面布置进行分析。 |
| 5. | Exchanges of land may be entered into by government for various reasons ranging from the rectification of lot boundaries to the implementation of a town planning layout 由于修正地界,以至执行城市规划蓝图计划等各种原因,政府也会与土地拥有人进行换地。 |
| 6. | Step 3 : complete the bury of all anchors and connection of construction equipment & slings according to figure 3 : plan layout for lifting and figure 4 : elevation layout for lifting 第三步:依据图三:吊装平面布置图、图四:吊装立面布置图,完成所有锚点的埋设和施工机索具的连接。 |
| 7. | An engineering and planning review study commenced in may 1998 to review the planning layout for the area and to define the scope and programme of each reclamation staging 工程及规划检讨研究已在一九九八年五月展开,以检讨该区的规划设计及界定每一阶段填海工程的范围及施工计划。 |
| 8. | Part iii , this part aims at the production and development character of the the new - high technology industrial development zone , analyze and discuss the overall plan layout , pipe integration layout 3 、针对高新技术工业的生产和发展特点,对高新技术工业区的总平面布置、管线综合布置进行分析、探讨。 |
| 9. | The overall planning layout was gazetted in april 2002 and detailed design works started in june . this phase , together with the other phases of the central and wan chai reclamation , will accommodate strategic road and rail links along the north shore of hong kong island between central and the island s eastern part 这期工程连同中环及湾仔填海计划其他各期工程,将会提供所需的土地,以便沿港岛北岸兴建连接中环与港岛东部的重要连接路和铁路。 |